(From the City of Joplin)Asphalt surfacing work will continue along South Connecticut Avenue and East 44th Street during the week of June 14th through June 18th, weather permitting.
Drivers in this area should be prepared for temporary delays as crews work on this project during this time.
Workers will continue placing the asphalt surfacing on the newly constructed roadway south of the I-44 overpass on Connecticut to 44th Street, and east 44th Street to Range Line Road. There will be flagmen to alert drivers to stops and delays during this process, and alternate traffic patterns will be utilized as well.
Businesses in these areas will remain open and accessible during normal operation hours during these projects. Drivers may want to choose alternative routes due to possible delays. If in the area, please use caution and watch for flagging operations indicating temporary lane or road closures.
No comments:
Post a Comment